Crane Used for High Rise Building

Crane Used for High Rise Building

This crane used for high rise building is R&D and designed for the core desires of high-altitude operation and heavy cloth hoisting in high-rise constructing construction. Its physique is made of high-strength steel, proposing a steady shape and amazing wind and earthquake resistance, which can adapt to the complicated working stipulations of extraordinary high-rise construction.
Share to
Send Inquiry
Description
Technical Parameters

Tianjin Huizhi (HUGE CRANE) is a expert manufacturing unit specializing in the manufacturing of tower cranes. With extra than 10 years of improvement history, the organisation enjoys excessive popularity each at domestic and abroad, and has an amazing popularity each domestically and internationally. The following are highlights of the factory's strengths, manufacturing line, secure furnish chain, and strict manipulate over cloth quality:

Factory Strength

Tianjin Huizhi (HUGE CRANE) has a wealth of trip and know-how in the manufacturing of tower cranes, with a crew of expert engineers and technicians. The manufacturing facility has superior manufacturing tools and technology, making sure first-rate product manufacturing.

01

Production Line

The manufacturing facility has an environment friendly and well-organized manufacturing line, which consists of quite a number levels such as uncooked fabric processing, element manufacturing, assembly, and testing. This ensures a easy and environment friendly manufacturing process, making sure well timed transport of merchandise to customers.

02

Stable Supply Chain

Tianjin Huizhi has hooked up a steady furnish chain over the years, making sure dependable get admission to to incredible uncooked substances and components. The agency works with dependable suppliers who adhere to strict high-quality standards, making sure constant fantastic in the remaining product.

03

Strict Quality Control

The manufacturing unit locations extraordinary emphasis on great control, making sure that strict requirements are accompanied all through the manufacturing process. Raw substances and aspects are cautiously chosen and inspected to make certain their first-rate and reliability. Additionally, the manufacturing unit conducts rigorous trying out and inspection on completed merchandise to make sure their overall performance and safety.

04

 

Product Description

 

 

This crane used for high rise building is R&D and designed for the core desires of high-altitude operation and heavy cloth hoisting in high-rise constructing construction. Its physique is made of high-strength steel, proposing a steady shape and amazing wind and earthquake resistance, which can adapt to the complicated working stipulations of extraordinary high-rise construction. The tools has robust hoisting capability and flexible slewing, and is outfitted with an shrewd digital manipulate device to gain specific luffing and hoisting control, radically enhancing the effectivity and protection of high-altitude operation.

-29
-33

 

Meanwhile, the total computing device is convenient to bring together and disassemble, and the operation top can be flexibly adjusted in accordance to the development development to adapt to building situations of exclusive flooring heights. This crane used for excessive upward shove constructing operates stably with a low failure rate, and can successfully whole the vertical switch and high-altitude hoisting of metal bars, concrete, prefabricated elements and different substances in high-rise constructing construction. It presents a enormously adaptable and dependable expert hoisting answer for high-rise constructing projects, assisting to improve building initiatives efficiently.

 

 

Technical specification

 

Parameter Item

Specification

Maximum Rated Lifting Capacity

12T

Maximum Lifting Moment

800 kN·m (80 t·m)

Jib Length

50-65m (suitable for high-rise building coverage needs)

Tip Lifting Capacity

3.2t (65m boom end)

Free-standing Height

52m

Attached Height

≤200m (suitable for super high-rise buildings)

Lifting Speed

0-80m/min (Variable frequency speed control, heavy load low speed)

Slewing Speed

0.6 rpm (stable operation, suitable for high-altitude working conditions)

Luffing Speed

20-60m/min

Tower Body Section

2.8×2.8m (enhancing high-altitude stability)

Safety Device

Load moment limiter, height limiter, anti-collision system

Hot Tags: crane used for high rise building, China crane used for high rise building manufacturers, suppliers, factory, Crane Used For High Rise Building, Cranes Used in High Rise Construction, Tower Crane Used in Construction, Used Flat Top Tower Crane, used tower crane

Send Inquiry
Send Inquiry